 |
|
| |
|
This tandem accelerator is built by National Electrostatics Corporation in Wisconsin, USA. This machine is used to measure carbon-14, berillium-10 and Iodine-129. Each run can measure 40 samples including 8 standards. The typical run time (6 cycles) is approximate 15 hours.
|
|
| |
|
|